Project Report
Project Topic: Automatic hand-wash System
Group Members
Yu Ann Loon (DEE0508-0386), Tan Ewe Gin (DEE0508-0385), See Tho Thim Chun (DEE0508-0381)
| Date | Things To Do | Current Status |
| | Buy electrical components -DC motor -LED x 3pcs - Relay x 2pcs | In progress |
| | Test the electrical components | In progress |
| | To learn about the relay function | In progress |
| | Using the wire connector to do our project | In progress |
| | The project work have been completed with wire connector | Complete |
| | To design the circuit board graph (DC only) | In progress |
| | Soldering the circuit board (DC only) | In progress |
| | Testing and solving circuit board problem (DC only) | Complete |
| 11//11/08 | To buy: -Relay Convector DC 12V to AC 240V -All Basin materials | In progress |
| 12/11/08 | Design the circuit board ( DC and AC) | In Progress |
| | Soldering the circuit board ( DC and AC) | In progress |
| | Testing and solving circuit board problem | Complete |
| | To buy: -PVC pipe 10feet x 3pcs - T-sockets x 18pcs - L-sockets x 12pcs | In progress |
| | Design and do PVC stand | In progress |
| | To set up all the basin materials on the PVC stand | Complete |
| | Solving our project technician problem | In progress |
| | Testing our project problem | In progress |
| | Finish our project | Complete |
| | Discuss our report | In progress |
| | Completed our report and upload to our team blog | Complete |